GAPS: on-board Electronic System for Measuring the Gaps

GAPS

GAPS

  • Client: Alstom
  • Equipment: 178 equipped trains
  • Standards: 61508, EN50126, EN50128, EN50129, CEM, vibrations and shocks,
    temperature
  • Safety level: SIL2

 

GAPS is intended to measure the distance between the platform and the train and to provide this measurement to the gap filling system and to control its roll-out system (SIL2). This gap filler is a mobile platform which fills the space between the train and the platform, allowing persons with reduced mobility to access the train in complete safety.

gaps HD

 

Documentation

zoom gaps web

Pictures

Comments are closed.