Urbalis Evolution Project: Peking metro, Alstom
For nearly two years ClearSy has
participated alongside Alstom Transport in the development of safety software
for the Peking metro (Beijing), which must very shortly be put into service for
the Olympic Games 2008. The Urbalis Evolution project has just renewed the range of products for
railway signalling (CBTC) deployed right the way around the world by Alstom
Transport.
For this new project, the engineers at Clearsy have assisted Alstom in the
writing of specifications associated with the safety software embarked aboard
(Automatic Train Protection).
The main functionalities of this software are to locate the train on the track
and to activate an emergency brake when the safety conditions are no longer
guaranteed.
This specification phase has enabled all the functionalities of this system to
be re-formalised using the knowledge of the Alstom teams.
From this specification the ClearSy engineers have worked binomially with the
Alstom team to develop the software by applying the formal B method; B methods
making the specification formal have been developed and then refined and
finally translated into Ada.
An initial complete version of this software entirely mathematically proven has
been finished off during the course of February.
|